Home
Project Details
Phase 1
Phase 2
Location
Size
Land Use
Development
The EIA Process
EIA Approach
Stakeholders Engagement
Specialist Studies
Environment Impact
Mining Permits
Decision Making
EIA Programme
Relevant Authorities
The Project Team
Public Participation
Downloads
Links
Contact Us
EIA Review Approach

BKS has reviewed and analysed the available specialist and supporting reports that were performed as part of the Environmental Scoping Report (ESR) (up to January 2004), as well as the bridging reports undertaken (between January 2004 and October 2006). The purpose of this review was to identify possible constraints and impacts that could have been overlooked, classify the subsequent steps to be followed in assembling the required information for the EIA process and identify potential changes to the identified mitigation measures.

The following reports have been reviewed and analysed:
Council for Geoscience: Geological Survey (CGS): Feasibility level investigation for the proposed Spring Grove Dam (Report No 1999-0051);
CGS: MMTS: Spring Grove Dam Site: Feasibility Level Construction Materials Investigation (Report No 1999-0052);
CGS: An Assessment of the Seismic Hazard Potential for the Site of the Mearns and Spring Grove Dams (Report No 1999-0026);
CGS: Fish Barrier Weir: Mooi River: First Engineering Geological Feasibility Report (Report No 2003-0212);
MMTS-1: Receiving Streams EIA (Nov 2000);
MMTS-1: Receiving Streams EMP (May 2002);
Main Report for MMTS-2 (Jan 2004);
Water Resources Analysis (Supporting Report 1, Jan 2004);
Stochastic Hydrology, Yield Determination and Operating Rules with the MMTS-2 in place (Oct 2006);
Dam Design (Supporting Report 2, Jan 2004);
Transfer Infrastructure (Supporting Report 3, Jan 2004);
Environmental Impact Assessment (Supporting Report 4, Oct 2002);
  • Biophysical Impact Assessment (Supporting Report 7, Oct 2002);
    o Identification of Water Falls Close to Inchbrakie Falls (DWAF Internal Report,        Oct 2002);
    o Impact of submerging Inchbrakie Falls Plants (Bridging Study 1, May 2004);
    o Technical Feasibility of Building a Fish Barrier (DWAF Internal Report, Dec        2003);
    o Provision of a Fish Barrier (Bridging Study 2, Jan 2005);
    o Investigation of the Presence of Smallmouth Bass Upstream of Spring Grove        Dam (Bridging Study 6, Aug 2005);
    o Environmental Impact Assessment for the proposed Fish Barrier on the Mooi        River Upstream of Spring Grove Dam (Bridging Study No 7, May 2006);
  • Identification of wetlands for rehabilitation (Bridging Study 3, Mar 2004);
  • Social Impact Assessment (Supporting Report 8, Oct 2002);
    o Historical and Cultural Sites and Graves (Bridging Study 4, Nov 2004);
  • Record of Public Participation (Supporting Report 10, Oct 2002);
Water Quality Assessment (Supporting Report 5, Jan 2004); and
Costing and Engineering Economy (Supporting Report 6, Jan 2004).
News Updates
2nd Public Meeting for The EIA Phase - Minutes
Minutes of the Pipeline Focus Group Meeting held on the 4th of June 2007

Site designed by 8IT